Fix 1 of 2
Have AI draft RFIs, change orders and notices from your notes and photos
Give AI the issue, the drawing reference and a photo; it drafts a clear, properly worded RFI or change order description. You check facts and send.
- 1Note the issue, location, drawing or spec reference and what you need decided.
- 2Attach a photo if it helps.
- 3Use the prompt below in an approved AI assistant (or the AI built into your site app).
- 4Check every reference and number, then submit through your normal system.
Draft a [RFI / CHANGE ORDER DESCRIPTION / DELAY NOTICE] for [PROJECT]. Issue: [WHAT IS WRONG OR UNCLEAR]. Location: [LEVEL, GRID, ROOM]. Reference: [DRAWING / SPEC SECTION]. What we need: [DECISION OR APPROVAL]. Cost and time impact if known: [DETAILS]. Keep it factual and short, suggest one possible solution, and state the date we need an answer by: [DATE]. Do not invent references.
Tools: ChatGPT, Claude, Gemini or Microsoft Copilot · Procore, Autodesk Build, Fieldwire, Buildertrend or Raken